SDV STAVBUILD
Construction work in Prague and surroundings

Demolition work

Before a renovation we remove the agreed surfaces and elements so the new stage can start. Any work on structures follows the documents and their assessment. We confirm waste removal and disposal in the quote.

Removing an old floor, uncovering the structure during a renovation
What the service includes

Clearing the space for the next stage

We plan demolition and strip-out work around what should stay in the existing space. Protecting the surroundings, disconnecting affected services and handling the material all need to be agreed.

We remove agreed tiles, floor layers and other elements during a renovation. Any work on structures follows the technical documents and the necessary assessment. We confirm waste removal and disposal as part of the quote.

01 / SCOPE

Removing old tiles and floors

02 / SCOPE

Strip-out in rooms under renovation

03 / SCOPE

Uncovering the base for further work

04 / SCOPE

Preparing the follow-on building work

How the work connects

Marking out and protection, Strip-out and uncovering, Preparing the next stage. We always confirm the exact scope and order based on the condition of the building.

Photos from our work

Demolition work in practice.

A selection of photos from different stages. Structures in progress, bases and finished surfaces.

Before we start

Scope, material
and dates.

For an exact quote we need to know the real condition and your brief. What do we clarify first?

What do you need for a quote?

The type of work, location, photos of the current condition and dimensions. If you have a design or a bill of quantities, that helps too. A site visit may be needed for a more exact brief.

Who supplies the material?

We agree the choice and supply of material for each job. We clarify in advance which materials the quote includes and what the client may supply.

How do you set the date and length of the work?

It depends on the scope, the condition of the building, how the trades follow each other and technical drying times. For outdoor work the weather also affects the schedule. We confirm the date once the brief is clear.

What if more work turns up during a renovation?

Once floors or walls are opened up, the condition can differ from what was visible. We discuss the change with you and confirm the scope and its effect on price and schedule.

Related work

This stage can be followed by

What are you planning to build?

Send photos and a short description. We'll discuss the scope and the next steps.

Describe your project