SDV STAVBUILD
Construction work in Prague and surroundings

Drywall

Drywall helps change a layout and finish ceilings and walls. We choose the structure and build-up based on how the room is used, the connections needed and where the services run.

Drywall ceiling, filled joints before the final finish
What the service includes

Drywall partitions and ceilings

Partitions and suspended ceilings help change a layout, hide services or create an even surface. Before installation we need to know the heights, where openings go and how it connects to the services.

The build-up depends on the room and the properties you need. A living room and a bathroom have different conditions. Installation ends with jointing and preparing for the final finish; acoustic or fire requirements must come from the specific design.

01 / SCOPE

Assembling the structure and profiles

02 / SCOPE

Partitions and ceilings

03 / SCOPE

Boarding with a suitable build-up for wet rooms

04 / SCOPE

Filling joints and preparing for painting

How the work connects

Setting out and profiles, Boarding the structure, Joints and final preparation. We always confirm the exact scope and order based on the condition of the building.

Photos from our work

Drywall in practice.

A selection of photos from different stages. Structures in progress, bases and finished surfaces.

Before we start

Scope, material
and dates.

For an exact quote we need to know the real condition and your brief. What do we clarify first?

What do you need for a quote?

The type of work, location, photos of the current condition and dimensions. If you have a design or a bill of quantities, that helps too. A site visit may be needed for a more exact brief.

Who supplies the material?

We agree the choice and supply of material for each job. We clarify in advance which materials the quote includes and what the client may supply.

How do you set the date and length of the work?

It depends on the scope, the condition of the building, how the trades follow each other and technical drying times. For outdoor work the weather also affects the schedule. We confirm the date once the brief is clear.

What if more work turns up during a renovation?

Once floors or walls are opened up, the condition can differ from what was visible. We discuss the change with you and confirm the scope and its effect on price and schedule.

Related work

This stage can be followed by

What are you planning to build?

Send photos and a short description. We'll discuss the scope and the next steps.

Describe your project