SDV STAVBUILD
Construction work in Prague and surroundings

Facades

We build new facades and renovate existing surfaces. We handle base preparation, renders and details around windows, doors and the plinth. We agree the scope and materials based on the condition of the house.

Family house while the facade is being finished
What the service includes

A facade is handled as a whole

When renovating a facade, we start with the condition of the old surface. Loose layers, uneven areas and joins between materials affect what comes next. The plinth, window reveals, sills and areas exposed to water matter too.

For a new facade or a repair, we choose the method and final texture based on the base and the look of the house. If insulation is part of the job, we combine both into connected stages. We plan the outdoor layers around the weather and the material requirements.

01 / SCOPE

Base preparation and repairs

02 / SCOPE

Facade renders and final finishes

03 / SCOPE

Reveals, plinths and junctions

04 / SCOPE

Renovating existing facades

How the work connects

Base preparation and repairs, Facade layers, Surface, reveals and plinth. We always confirm the exact scope and order based on the condition of the building.

Photos from our work

Facades in practice.

A selection of photos from different stages. Structures in progress, bases and finished surfaces.

Before we start

Scope, material
and dates.

For an exact quote we need to know the real condition and your brief. What do we clarify first?

What do you need for a quote?

The type of work, location, photos of the current condition and dimensions. If you have a design or a bill of quantities, that helps too. A site visit may be needed for a more exact brief.

Who supplies the material?

We agree the choice and supply of material for each job. We clarify in advance which materials the quote includes and what the client may supply.

How do you set the date and length of the work?

It depends on the scope, the condition of the building, how the trades follow each other and technical drying times. For outdoor work the weather also affects the schedule. We confirm the date once the brief is clear.

What if more work turns up during a renovation?

Once floors or walls are opened up, the condition can differ from what was visible. We discuss the change with you and confirm the scope and its effect on price and schedule.

Related work

This stage can be followed by

What are you planning to build?

Send photos and a short description. We'll discuss the scope and the next steps.

Describe your project