SDV STAVBUILD
Construction work in Prague and surroundings

Bathroom renovations

We renovate bathrooms as part of a whole flat or on their own. We handle the building preparation, suitable bases and tiling. Water, drainage and electrics are done by external specialists; we coordinate their work with the other stages.

Finished bathroom, tiles, shower area and junctions
What the service includes

Construction work and trades in the right order

For a bathroom renovation we first agree the layout, where the fittings go and the tiles you want. Depending on the space, strip-out, base work and preparation for services follow.

Water, drainage and electrics are handled by external specialists. Our building finishing, waterproofing layers, wall and floor tiles follow their work. We agree in advance who supplies the fittings and how the stages connect.

01 / SCOPE

Strip-out and building alterations as agreed

02 / SCOPE

Preparing walls and floors

03 / SCOPE

Waterproofing layers under tiles as specified

04 / SCOPE

Tiling and finishing the junctions

How the work connects

Strip-out and preparation, Services by qualified trades, Tiling and finishing. We always confirm the exact scope and order based on the condition of the building.

Photos from our work

Bathroom renovations in practice.

A selection of photos from different stages. Structures in progress, bases and finished surfaces.

Before we start

Scope, material
and dates.

For an exact quote we need to know the real condition and your brief. What do we clarify first?

What do you need for a quote?

The type of work, location, photos of the current condition and dimensions. If you have a design or a bill of quantities, that helps too. A site visit may be needed for a more exact brief.

Who supplies the material?

We agree the choice and supply of material for each job. We clarify in advance which materials the quote includes and what the client may supply.

How do you set the date and length of the work?

It depends on the scope, the condition of the building, how the trades follow each other and technical drying times. For outdoor work the weather also affects the schedule. We confirm the date once the brief is clear.

What if more work turns up during a renovation?

Once floors or walls are opened up, the condition can differ from what was visible. We discuss the change with you and confirm the scope and its effect on price and schedule.

Related work

This stage can be followed by

What are you planning to build?

Send photos and a short description. We'll discuss the scope and the next steps.

Describe your project